Skip to main content
SeeChamonix

T-5 Days Le Tour de France - Finhaut-Emosson

Road closures & public information

featured in News & reviews Author Ellie Mahoney, Chamonix Editor Updated

With only 5 days left to go until stage 17 of the 2016 Tour de France arrives at the Emosson Dam, more details on road closures and information for spectators has been released.

Stage 17 sees the peleton setting off from Bern in Switzerland and cycling 184.5 km to reach the finish point at the Emosson Dam.

a stage of the tour de france 2016Road closures will take place for 4 hours. The col de Forclaz will be closed in the morning of the 20th July, the exact timings are still to be announced. The road for La Léchère/Finhaut – Emosson will be closed for longer, from Sunday 17th July at 18:00.

Camper vans will not be allowed access due to lack of space on the roads, however two temporary campsites have been created in Finhault and Salvan.

The road between Chamonix and Martigny around the border will also be closed from 06:30 on 20th July. A free shuttle bus service will be in operation from Martigny to Finhault.

The caravan should arrive in the area around 15:40 with the peleton anticipated at around 17:00.

Read the full public briefing document which includes more detail on road closure timings, public & rider safety, and how to watch if you're coming from Switzerland towards Chamonix. If you're coming from the French side to watch, read our guide on how to watch Le Tour and more info on road closures and timings.